Day 26

More soffit and crown, A/C vents back in and cabinet hardware started.

IMG_1507  IMG_1510IMG_1511  IMG_1509

Posted in Family Update | Leave a comment

Day 25

Rest of the lights were connected as well as switches and outlets.  The micro and stove were wired in and are now usable.

IMG_1500  IMG_1499IMG_1502  IMG_1501IMG_1504

Everything on

IMG_1505  IMG_1506

Posted in Family Update | 2 Comments

Day 23

Lights are on. Microwave and vent went in. New door and trim. And the laundry room is back together again.

IMG_1491  IMG_1496IMG_1493  IMG_1494IMG_1498

IMG_1497  IMG_1490

Posted in Family Update | 2 Comments

Day 22

It certainly was Labor Day. Tiled (vinyl) and grouted the laundry room floor.  My knees are burning.

IMG_1485  IMG_1486IMG_1487     IMG_1488

Posted in Family Update | 1 Comment

Day 20

Ripped up the laundry room floor (beast), then started with the luan underlayment.

IMG_1483 IMG_1482

Posted in Family Update | Leave a comment

Day 19

Countertop, plumbing and faucet.  Some trim work.IMG_1473 IMG_1475 IMG_1474  IMG_1477IMG_1476  IMG_1481 IMG_1479 IMG_1478

Posted in Family Update | Leave a comment

Day 18

Upper cabinets and island are in.

IMG_1463  IMG_1464

IMG_1472  IMG_1465

IMG_1469 IMG_1468 IMG_1467 IMG_1466

IMG_1470

Posted in Family Update | 1 Comment

Day 16

Finished painting today and thought daylight pics would be better.

IMG_1457  IMG_1455

Posted in Family Update | Leave a comment

First Day of School

IMG_1447 IMG_1449 IMG_1452 IMG_1454

Posted in Family Update | 1 Comment

Day 15

Patti painted the kitchen (areas not covered by cabinets) and the dining room.  Pictures at night don’t show the color as well.

IMG_1438  IMG_1439IMG_1443  IMG_1446

Posted in Family Update | 1 Comment